1 00:00:17,480 --> 00:00:15,169 Saturn one 1b quarterly film report 2 00:00:23,150 --> 00:00:17,490 number 22 covers progress during the 3 00:00:26,060 --> 00:00:23,160 period October November December 1964 at 4 00:00:27,890 --> 00:00:26,070 Marshall on October 6th static firing of 5 00:00:30,500 --> 00:00:27,900 the booster for the 10th flight vehicle 6 00:00:34,100 --> 00:00:30,510 s 1:10 concluded the highly successful 7 00:00:37,100 --> 00:00:34,110 s1 booster static test program during 8 00:00:41,119 --> 00:00:37,110 this test program from April 29th 1960 9 00:00:44,540 --> 00:00:41,129 to October 6 to 1964 a total of 24 10 00:00:47,569 --> 00:00:44,550 firings was conducted accumulating 1885 11 00:00:50,389 --> 00:00:47,579 seconds of flight stage firing following 12 00:00:52,639 --> 00:00:50,399 completion of its static firing s1 10 13 00:00:54,139 --> 00:00:52,649 was prepared for shipment to miss Yu for 14 00:00:56,689 --> 00:00:54,149 post static check out 15 00:01:03,049 --> 00:00:56,699 it left Marshall on November 3rd and 16 00:01:06,080 --> 00:01:03,059 arrived at miss you November 7th at 17 00:01:08,480 --> 00:01:06,090 Michou Chrysler started preparing s1 10 18 00:01:10,130 --> 00:01:08,490 for post static check out the work 19 00:01:12,320 --> 00:01:10,140 included installation of flight 20 00:01:16,490 --> 00:01:12,330 components and instrumentation as well 21 00:01:19,550 --> 00:01:16,500 as stage modification and repair early 22 00:01:21,109 --> 00:01:19,560 this quarter s-19 completed post static 23 00:01:24,560 --> 00:01:21,119 check out at Marshalls quality 24 00:01:26,570 --> 00:01:24,570 laboratory the stage and si u9 were then 25 00:01:29,630 --> 00:01:26,580 shipped to Cape Kennedy by barge on 26 00:01:32,120 --> 00:01:29,640 October 19th during rough seas in 27 00:01:34,969 --> 00:01:32,130 transit instrumentation indicated high 28 00:01:38,480 --> 00:01:34,979 g-forces on the stage which warranted 29 00:01:39,050 --> 00:01:38,490 inspection no damage was revealed eleven 30 00:01:42,980 --> 00:01:39,060 days later 31 00:01:44,929 --> 00:01:42,990 s19 arrived at KSC following receiving 32 00:01:48,980 --> 00:01:44,939 inspection the stage was erected on the 33 00:01:51,380 --> 00:01:48,990 pad November 3rd at the sacto test 34 00:01:54,109 --> 00:01:51,390 facility Douglas completed all phases of 35 00:01:56,719 --> 00:01:54,119 s4 nine tes ting and final inspection 36 00:01:58,940 --> 00:01:56,729 the stage was stored temporarily until 37 00:02:02,450 --> 00:01:58,950 October 21st when it was flown to Cape 38 00:02:04,940 --> 00:02:02,460 Kennedy arriving October 22nd the stage 39 00:02:07,969 --> 00:02:04,950 was transported to hangar AF and hangar 40 00:02:10,400 --> 00:02:07,979 checkout was begun following application 41 00:02:13,330 --> 00:02:10,410 of a special heat-resistant paint the 42 00:02:15,490 --> 00:02:13,340 stage was erected on the pad November 19 43 00:02:17,830 --> 00:02:15,500 the purpose of the paint is to prevent 44 00:02:20,290 --> 00:02:17,840 thermal damage to the Pegasus spacecraft 45 00:02:24,670 --> 00:02:20,300 during flight the same paint was applied 46 00:02:26,619 --> 00:02:24,680 to the instrument unit on November 19th 47 00:02:31,479 --> 00:02:26,629 upon completion of the paint curing 48 00:02:33,430 --> 00:02:31,489 process si u9 was also erected launch 49 00:02:36,970 --> 00:02:33,440 vehicle pre-flight check out is 50 00:02:39,400 --> 00:02:36,980 proceeding on schedule the spacecraft 51 00:02:41,890 --> 00:02:39,410 service module and adapter for si 9 52 00:02:45,430 --> 00:02:41,900 arrived at the Cape on November 13th and 53 00:02:47,319 --> 00:02:45,440 was transported to hangar AF here the 54 00:02:49,809 --> 00:02:47,329 service module is being checked out for 55 00:02:52,240 --> 00:02:49,819 flight this includes checking of Pegasus 56 00:02:54,520 --> 00:02:52,250 mounting pads for alignment the command 57 00:02:58,089 --> 00:02:54,530 module was shipped to Cape Kennedy last 58 00:03:01,330 --> 00:02:58,099 quarter care child Hiller completed 59 00:03:03,670 --> 00:03:01,340 fabrication of Pegasus a4 s a9 at 60 00:03:06,280 --> 00:03:03,680 Hagerstown Maryland early this quarter 61 00:03:08,259 --> 00:03:06,290 following assembly and functional tests 62 00:03:10,449 --> 00:03:08,269 the unit was then shipped to General 63 00:03:12,880 --> 00:03:10,459 Electric Valley Forge Pennsylvania in 64 00:03:15,610 --> 00:03:12,890 December there it was subjected to 65 00:03:18,190 --> 00:03:15,620 low-level vibration and shake tests 66 00:03:21,009 --> 00:03:18,200 later the unit was moved into a vacuum 67 00:03:23,229 --> 00:03:21,019 test chamber for systems checkout and 68 00:03:25,990 --> 00:03:23,239 electric component testing following 69 00:03:27,610 --> 00:03:26,000 satisfactory testing the spacecraft was 70 00:03:30,819 --> 00:03:27,620 packaged and shipped to Cape Kennedy 71 00:03:34,930 --> 00:03:30,829 December 29th it was taken to hangar D 72 00:03:37,210 --> 00:03:34,940 where checkout has begun meanwhile at 73 00:03:40,270 --> 00:03:37,220 Marshalls Michou operations Chrysler 74 00:03:43,839 --> 00:03:40,280 completed post static check out of s18 75 00:03:45,580 --> 00:03:43,849 on December 22nd by the end of December 76 00:03:48,069 --> 00:03:45,590 the stage was being prepared for 77 00:03:51,640 --> 00:03:48,079 shipment to Cape Kennedy next report 78 00:03:53,949 --> 00:03:51,650 period early this report period at SAC 79 00:03:56,500 --> 00:03:53,959 doe s for eight static firing 80 00:03:58,690 --> 00:03:56,510 preparations started on November 20th 81 00:04:06,940 --> 00:03:58,700 the stage was successfully fired for a 82 00:04:09,309 --> 00:04:06,950 period of 476 seconds at santa monica 83 00:04:11,559 --> 00:04:09,319 s410 simulated flight tests were 84 00:04:14,199 --> 00:04:11,569 completed in mid-october and stage 85 00:04:15,970 --> 00:04:14,209 modifications were begun following 86 00:04:19,029 --> 00:04:15,980 modifications the stage was shipped to 87 00:04:22,180 --> 00:04:19,039 sacto this marks the completion of s4 88 00:04:24,790 --> 00:04:22,190 manufacturing by douglas s410 was 89 00:04:27,280 --> 00:04:24,800 installed in test and to be on December 90 00:04:30,970 --> 00:04:27,290 5th Static firing is scheduled 91 00:04:34,000 --> 00:04:30,980 January 20th check out of the instrument 92 00:04:36,160 --> 00:04:34,010 unit for the night flight vehicle si u8 93 00:04:38,920 --> 00:04:36,170 located at Marshalls quality and 94 00:04:41,260 --> 00:04:38,930 reliability assurance laboratory began 95 00:04:43,720 --> 00:04:41,270 October 28th and continued through 96 00:04:46,000 --> 00:04:43,730 December checkout of components is 97 00:04:49,440 --> 00:04:46,010 expected to continue as scheduled with 98 00:04:52,960 --> 00:04:49,450 completion of tests due in January 99 00:04:55,120 --> 00:04:52,970 also at Marshall SIU 10 component 100 00:04:59,020 --> 00:04:55,130 installation begun last quarter is 101 00:05:01,510 --> 00:04:59,030 continuing as scheduled at the fairchild 102 00:05:03,880 --> 00:05:01,520 hiller facility Hagerstown Maryland the 103 00:05:06,010 --> 00:05:03,890 Pegasus prototype was used to prove out 104 00:05:09,160 --> 00:05:06,020 minor circuit changes prior to in 105 00:05:11,200 --> 00:05:09,170 cooperation in Pegasus a next quarter 106 00:05:13,660 --> 00:05:11,210 the prototype will be shipped to General 107 00:05:17,650 --> 00:05:13,670 Electric Valley Forge Pennsylvania for 108 00:05:19,720 --> 00:05:17,660 functional testing shell Dahl Northfield 109 00:05:22,690 --> 00:05:19,730 Minnesota has successfully bonded 110 00:05:24,250 --> 00:05:22,700 acceptable detector panels all the 111 00:05:26,830 --> 00:05:24,260 required panels were delivered to 112 00:05:29,110 --> 00:05:26,840 Fairchild on November 30th following 113 00:05:32,950 --> 00:05:29,120 successful completion of qualification 114 00:05:35,860 --> 00:05:32,960 tests structural component assembly on 115 00:05:38,710 --> 00:05:35,870 Pegasus B and C is underway at the 116 00:05:40,990 --> 00:05:38,720 fairchild hiller facility fabrication of 117 00:05:43,540 --> 00:05:41,000 black boxes for both satellites is on 118 00:05:51,790 --> 00:05:43,550 schedule installation of flight systems 119 00:05:53,950 --> 00:05:51,800 is expected next quarter at Marshalls 120 00:05:56,800 --> 00:05:53,960 Michou operations functional check out 121 00:05:59,650 --> 00:05:56,810 of the s1b dynamics stage was completed 122 00:06:01,180 --> 00:05:59,660 in mid-december by December 22nd the 123 00:06:04,300 --> 00:06:01,190 stage was ready for shipment from 124 00:06:06,730 --> 00:06:04,310 Chrysler miss you to MSFC for use in 125 00:06:10,300 --> 00:06:06,740 dynamic testing of the Saturn 1b vehicle 126 00:06:12,370 --> 00:06:10,310 configuration meanwhile at da C's 127 00:06:15,100 --> 00:06:12,380 Huntington Beach facility assembly and 128 00:06:17,350 --> 00:06:15,110 check out of the s4 be dynamic stage was 129 00:06:19,360 --> 00:06:17,360 completed early this quarter during 130 00:06:21,610 --> 00:06:19,370 November the stage was prepared for 131 00:06:23,890 --> 00:06:21,620 shipment to Marshall on December night 132 00:06:26,200 --> 00:06:23,900 the stage left the west coast aboard an 133 00:06:29,290 --> 00:06:26,210 ocean freighter arriving at New Orleans 134 00:06:31,330 --> 00:06:29,300 December 21st at New Orleans the stage 135 00:06:33,610 --> 00:06:31,340 was transferred to a river barge and 136 00:06:36,940 --> 00:06:33,620 departed for MSFC with the barge 137 00:06:39,130 --> 00:06:36,950 carrying the s1 be dynamic stage the 138 00:06:40,719 --> 00:06:39,140 dynamic test stages were unloaded at 139 00:06:45,249 --> 00:06:40,729 Marshall 13 140 00:06:47,350 --> 00:06:45,259 later during the same time period MSFC 141 00:06:49,600 --> 00:06:47,360 completed assembly of the dynamic test 142 00:06:51,640 --> 00:06:49,610 instrument unit structure from segments 143 00:06:54,249 --> 00:06:51,650 fabricated by General Dynamics Fort 144 00:06:56,559 --> 00:06:54,259 Worth Texas following installation of 145 00:06:59,230 --> 00:06:56,569 dummy components the unit will be mated 146 00:07:02,579 --> 00:06:59,240 to the s4b dynamics stage in the test 147 00:07:05,769 --> 00:07:02,589 stand testing will start next quarter 148 00:07:08,739 --> 00:07:05,779 the delivery of the Saturn 1b dynamic 149 00:07:10,869 --> 00:07:08,749 test vehicle to MSFC indicates the 150 00:07:15,219 --> 00:07:10,879 significant progress of the Saturn 1b 151 00:07:18,459 --> 00:07:15,229 program at Mizzou Chrysler completed 152 00:07:21,129 --> 00:07:18,469 assembly operations on the s-1 b1 first 153 00:07:23,320 --> 00:07:21,139 flight stage early this quarter pre 154 00:07:26,110 --> 00:07:23,330 static checkout operations of the stage 155 00:07:28,059 --> 00:07:26,120 are now well underway with mechanical 156 00:07:32,230 --> 00:07:28,069 testing and measurement calibrations 157 00:07:34,510 --> 00:07:32,240 progressing as scheduled s 1 B 2 tank 158 00:07:37,089 --> 00:07:34,520 clustering was completed during October 159 00:07:39,070 --> 00:07:37,099 other assembly operations continued 160 00:07:40,899 --> 00:07:39,080 throughout the quarter and are scheduled 161 00:07:45,879 --> 00:07:40,909 for completion during the next report 162 00:07:47,769 --> 00:07:45,889 period s1 b3 tail section assembly was 163 00:07:50,139 --> 00:07:47,779 completed and build-up of the stages 164 00:07:52,510 --> 00:07:50,149 spider beam began during the quarter 165 00:07:54,879 --> 00:07:52,520 stage fabrication is expected to be 166 00:07:58,360 --> 00:07:54,889 completed early next quarter and will be 167 00:08:01,079 --> 00:07:58,370 followed by tank clustering fabrication 168 00:08:03,790 --> 00:08:01,089 operations are underway for s1 d4 169 00:08:06,519 --> 00:08:03,800 build-up of the upper and lower thrust 170 00:08:09,869 --> 00:08:06,529 ring began in late October tank 171 00:08:13,179 --> 00:08:09,879 clustering is scheduled for late March a 172 00:08:15,730 --> 00:08:13,189 DAC Sacramento tests aerial preparations 173 00:08:18,159 --> 00:08:15,740 for the first s4b battleship hot firing 174 00:08:19,719 --> 00:08:18,169 continued through October routine 175 00:08:22,420 --> 00:08:19,729 hardware and equipment checks were made 176 00:08:26,499 --> 00:08:22,430 followed by successful j2 engine thrust 177 00:08:28,629 --> 00:08:26,509 chamber chill down tests on November 7th 178 00:08:30,969 --> 00:08:28,639 the first hot pairing was cut off prior 179 00:08:33,850 --> 00:08:30,979 to main stage by a gas generator over 180 00:08:36,009 --> 00:08:33,860 temperature command on November 24th a 181 00:08:38,079 --> 00:08:36,019 second firing of the stage resulted in a 182 00:08:40,180 --> 00:08:38,089 successful test of one second duration 183 00:08:42,670 --> 00:08:40,190 on December 1st 184 00:08:46,930 --> 00:08:42,680 a third firing lasting 10 seconds was 185 00:08:49,689 --> 00:08:46,940 performed on December 23rd a 416 second 186 00:08:52,090 --> 00:08:49,699 firing was highly successful static test 187 00:08:52,900 --> 00:08:52,100 will continue next quarter engine chill 188 00:08:55,150 --> 00:08:52,910 down propeller 189 00:08:59,080 --> 00:08:55,160 utilization and engine gimbal intest 190 00:09:01,720 --> 00:08:59,090 will also be conducted at SAC toes gamma 191 00:09:03,940 --> 00:09:01,730 complex a series of single and multiple 192 00:09:06,340 --> 00:09:03,950 attitude control engines first phase 193 00:09:08,550 --> 00:09:06,350 development firings was successfully 194 00:09:11,500 --> 00:09:08,560 conducted in October 195 00:09:13,120 --> 00:09:11,510 also at Sacramento Douglas continued 196 00:09:15,520 --> 00:09:13,130 installation of ground support equipment 197 00:09:18,130 --> 00:09:15,530 and necessary instrumentation on beta 198 00:09:20,920 --> 00:09:18,140 test stand number three when the stand 199 00:09:22,900 --> 00:09:20,930 is completed the s4b facilities checkout 200 00:09:25,150 --> 00:09:22,910 stage will be installed for propellant 201 00:09:29,020 --> 00:09:25,160 loading tests scheduled to start in 202 00:09:30,790 --> 00:09:29,030 early March cleaning and installation of 203 00:09:33,340 --> 00:09:30,800 the facilities checkout stage at 204 00:09:35,050 --> 00:09:33,350 Huntington Beach is now complete Douglas 205 00:09:36,550 --> 00:09:35,060 will use the stage for facilities 206 00:09:40,390 --> 00:09:36,560 checkout at Cape Kennedy after 207 00:09:42,280 --> 00:09:40,400 propellant loading tests components from 208 00:09:44,380 --> 00:09:42,290 the original facilities checkout stage 209 00:09:46,900 --> 00:09:44,390 have been reallocated as an s4b 210 00:09:48,550 --> 00:09:46,910 sectional mock-up the stage will be 211 00:09:52,540 --> 00:09:48,560 shipped to Marshall for use on an 212 00:09:54,090 --> 00:09:52,550 overall Saturn 1b simulator at the air 213 00:09:56,950 --> 00:09:54,100 research facility in Phoenix Arizona 214 00:09:59,560 --> 00:09:56,960 pressure testing of s4b propellant 215 00:10:02,670 --> 00:09:59,570 loading flexible hoses to failure was 216 00:10:05,320 --> 00:10:02,680 conducted this quarter for Douglas a 217 00:10:07,360 --> 00:10:05,330 Douglass's Santa Monica and huntington 218 00:10:10,510 --> 00:10:07,370 beach facilities fabrication and 219 00:10:14,140 --> 00:10:10,520 assembly of s 4 D 1 B flight stages is 220 00:10:18,070 --> 00:10:14,150 also well underway at Huntington Beach 221 00:10:20,170 --> 00:10:18,080 tank insulation of the s4 b1 b1 first 222 00:10:22,660 --> 00:10:20,180 flight stage was completed this quarter 223 00:10:24,280 --> 00:10:22,670 work was also underway at the end of the 224 00:10:28,170 --> 00:10:24,290 quarter an installation of electrical 225 00:10:30,220 --> 00:10:28,180 and mechanical systems on the stage 226 00:10:34,180 --> 00:10:30,230 application of liquid hydrogen tank 227 00:10:37,810 --> 00:10:34,190 insulation on s4 b1 b2 was completed in 228 00:10:39,460 --> 00:10:37,820 mid-december fabrication and assembly of 229 00:10:43,290 --> 00:10:39,470 the propellant tanks and thrust 230 00:10:45,790 --> 00:10:43,300 structures for s4 b1 b3 and 1b for 231 00:10:47,890 --> 00:10:45,800 continued during this quarter tank 232 00:10:50,730 --> 00:10:47,900 installation for both of the stages is 233 00:10:53,290 --> 00:10:50,740 scheduled to begin next quarter and 234 00:10:56,020 --> 00:10:53,300 rocket Dynes said a susanna test 235 00:10:58,090 --> 00:10:56,030 facility j2 engine preliminary flight 236 00:11:01,960 --> 00:10:58,100 rating tests were successfully completed 237 00:11:03,730 --> 00:11:01,970 this quarter with 18 starts and 2351 238 00:11:07,600 --> 00:11:03,740 seconds of firing time 239 00:11:09,970 --> 00:11:07,610 R&D engine Oh fifteen frt configuration 240 00:11:12,370 --> 00:11:09,980 accumulated forty starts and four 241 00:11:14,710 --> 00:11:12,380 thousand sixty three seconds including 242 00:11:17,290 --> 00:11:14,720 three for duration five hundred second 243 00:11:19,630 --> 00:11:17,300 firings evaluation of start condition 244 00:11:27,970 --> 00:11:19,640 limits on this engine indicates no 245 00:11:30,100 --> 00:11:27,980 problems with the start signals the j2 246 00:11:32,350 --> 00:11:30,110 engines restart capability was 247 00:11:35,320 --> 00:11:32,360 demonstrated during the report period an 248 00:11:39,070 --> 00:11:35,330 engine was fired for 165 seconds 249 00:11:43,600 --> 00:11:39,080 shutdown for 75 minutes restarted and 250 00:11:46,660 --> 00:11:43,610 run for 310 seconds at Santa Susana 251 00:11:49,210 --> 00:11:46,670 vertical test stands 3a is closed for 252 00:11:51,160 --> 00:11:49,220 renovation accessory improvements are 253 00:11:53,260 --> 00:11:51,170 expected to provide better engine start 254 00:11:55,930 --> 00:11:53,270 conditions and more effective altitude 255 00:12:00,820 --> 00:11:55,940 simulation for flight ratings the stands 256 00:12:03,280 --> 00:12:00,830 will be reactivated in January 1965 as a 257 00:12:05,920 --> 00:12:03,290 result of a j2 engine gas generator 258 00:12:08,020 --> 00:12:05,930 explosion last quarter Rocketdyne built 259 00:12:10,600 --> 00:12:08,030 on pneumatic control system mock-up 260 00:12:13,440 --> 00:12:10,610 including the gas generator to evaluate 261 00:12:16,720 --> 00:12:13,450 the problem and to determine a solution 262 00:12:18,430 --> 00:12:16,730 the j2 engine gas generator valve case 263 00:12:21,580 --> 00:12:18,440 was connected to the control pressure 264 00:12:23,590 --> 00:12:21,590 point then tested analysis of test data 265 00:12:25,570 --> 00:12:23,600 indicated that this method of assembly 266 00:12:28,300 --> 00:12:25,580 would be successful in preventing an 267 00:12:30,760 --> 00:12:28,310 explosion during this quarter at 268 00:12:32,620 --> 00:12:30,770 Rocketdyne flame resistance testing of 269 00:12:35,290 --> 00:12:32,630 the connector for the flexible armored 270 00:12:37,660 --> 00:12:35,300 harness used for all j2 electrical 271 00:12:40,540 --> 00:12:37,670 control and instrumentation wiring was 272 00:12:42,640 --> 00:12:40,550 conducted in this test the system which 273 00:12:45,100 --> 00:12:42,650 stood a time in temperature rate of 6 274 00:12:47,320 --> 00:12:45,110 and 1/2 minutes and 2,000 degrees 275 00:12:51,850 --> 00:12:47,330 Fahrenheit which exceeds normal 276 00:12:54,340 --> 00:12:51,860 requirements at MSFC construction of the 277 00:12:56,860 --> 00:12:54,350 j2 engine test facility is virtually 278 00:13:00,850 --> 00:12:56,870 complete unofficial use of the facility 279 00:13:03,220 --> 00:13:00,860 is expected in January vibration testing 280 00:13:05,830 --> 00:13:03,230 for evaluation of instrument unit cold 281 00:13:08,800 --> 00:13:05,840 plates manufactured by four vendors of 282 00:13:11,770 --> 00:13:08,810 cold North American solar aircraft and 283 00:13:14,170 --> 00:13:11,780 Toronto continued at MSFC during this 284 00:13:16,420 --> 00:13:14,180 period vendor selection will be made 285 00:13:18,130 --> 00:13:16,430 following completion of evaluation 286 00:13:20,510 --> 00:13:18,140 testing 287 00:13:22,460 --> 00:13:20,520 manufacture of the instrument unit to be 288 00:13:24,830 --> 00:13:22,470 used for vibration testing is now 289 00:13:26,870 --> 00:13:24,840 complete the unit was shipped November 290 00:13:28,870 --> 00:13:26,880 30th to the test site at Wiley 291 00:13:30,980 --> 00:13:28,880 laboratories Huntsville Alabama 292 00:13:33,200 --> 00:13:30,990 preparation of test facilities is 293 00:13:36,130 --> 00:13:33,210 continuing and vibration testing is 294 00:13:38,690 --> 00:13:36,140 scheduled to start next quarter 295 00:13:40,730 --> 00:13:38,700 negotiations of the Saturn 1b 5 296 00:13:42,440 --> 00:13:40,740 instrument unit mission contract is 297 00:13:45,650 --> 00:13:42,450 continuing with International Business 298 00:13:48,800 --> 00:13:45,660 Machines IBM personnel are currently at 299 00:13:50,540 --> 00:13:48,810 work in the Huntsville facility one of 300 00:13:52,820 --> 00:13:50,550 the activities in which IBM is 301 00:13:55,370 --> 00:13:52,830 participating is preparation for the 302 00:13:57,950 --> 00:13:55,380 flight systems test program a thermal 303 00:14:00,350 --> 00:13:57,960 vacuum test of the entire IU under 304 00:14:02,510 --> 00:14:00,360 simulated space flight conditions to be 305 00:14:04,280 --> 00:14:02,520 performed in an environmental chamber at 306 00:14:07,400 --> 00:14:04,290 Douglas aircrafts Huntington Beach 307 00:14:09,470 --> 00:14:07,410 facility to reduce costly duplication of 308 00:14:11,390 --> 00:14:09,480 testing facilities special test 309 00:14:13,640 --> 00:14:11,400 equipment which will be required both at 310 00:14:15,890 --> 00:14:13,650 Huntsville and Huntington Beach is being 311 00:14:20,150 --> 00:14:15,900 installed in trailers which can be air 312 00:14:22,250 --> 00:14:20,160 transported between these locations IBM 313 00:14:24,260 --> 00:14:22,260 personnel performed a circuitry analysis 314 00:14:26,930 --> 00:14:24,270 of the I use remote digital sub 315 00:14:29,030 --> 00:14:26,940 multiplexer breadboard circuit modules 316 00:14:31,370 --> 00:14:29,040 which duplicate production hardware in 317 00:14:33,800 --> 00:14:31,380 component utilization and location are 318 00:14:35,900 --> 00:14:33,810 tested in a temperature chamber to 319 00:14:38,090 --> 00:14:35,910 detect possible circuit pal functions 320 00:14:41,780 --> 00:14:38,100 resulting from components tolerance 321 00:14:44,240 --> 00:14:41,790 accumulations also in progress this 322 00:14:46,520 --> 00:14:44,250 quarter were design evaluation studies 323 00:14:49,730 --> 00:14:46,530 on a newly designed channel unit for the 324 00:14:52,280 --> 00:14:49,740 IU telemetry system experience gained in 325 00:14:55,160 --> 00:14:52,290 all these operations is expected to find 326 00:14:57,350 --> 00:14:55,170 valuable applications as IBM phases into 327 00:15:01,090 --> 00:14:57,360 complete responsibility for a mission 328 00:15:04,850 --> 00:15:01,100 qualified Saturn 1b five instrument unit 329 00:15:06,800 --> 00:15:04,860 at MSFC installation of equipment for 330 00:15:09,350 --> 00:15:06,810 the Saturn 1b system development 331 00:15:11,300 --> 00:15:09,360 breadboard facility continued the 332 00:15:13,340 --> 00:15:11,310 facility will be used for checkout of 333 00:15:16,400 --> 00:15:13,350 vehicle hardware and ground computer 334 00:15:18,410 --> 00:15:16,410 programs the first Saturn 1b test was 335 00:15:20,270 --> 00:15:18,420 performed recently to verify the 336 00:15:22,460 --> 00:15:20,280 compatibility of the ground support 337 00:15:27,200 --> 00:15:22,470 equipment and associated vehicle systems 338 00:15:30,630 --> 00:15:27,210 with the st 124 stabilized platform in 339 00:15:32,520 --> 00:15:30,640 summary October November and December 340 00:15:36,270 --> 00:15:32,530 months of noticeable achievements in the 341 00:15:38,430 --> 00:15:36,280 Saturn one and Saturn 1b programs sa9 342 00:15:41,310 --> 00:15:38,440 was being readied for its operational 343 00:15:43,920 --> 00:15:41,320 flight a significant highlight was the 344 00:15:48,510 --> 00:15:43,930 successful long duration hot firing of 345 00:15:51,590 --> 00:15:48,520 the s4b battleship stage j2 engine hot 346 00:15:54,000 --> 00:15:51,600 firings were highly successful 347 00:15:56,250 --> 00:15:54,010 accomplishments in the Saturn 1 program 348 00:15:59,130 --> 00:15:56,260 have broadened the outlook for an